NCS Life Testing In Progress at Moore Industries Headquarters

NCS Life Testing In Progress at Moore Industries Headquarters

At Moore Industries’ California headquarters, two Net Concentrator systems (NCS) are undergoing two different life tests to observe long term operation and how components comprising the NCS behave under extreme conditions. Observations and results from these tests will help engineering improve designs for real world applications and double as live units to facilitate troubleshooting should end users require assistance.

Published: September 19, 2017

FDY: PC-Programmable Frequency-to-DC Converter (2-Wire)

FDY: PC-Programmable Frequency-to-DC Converter (2-Wire)
Published: September 14, 2017

EHELP: Are the STA and SPA2 process alarm relays configurable as Failsafe?

EHELP: Are the STA and SPA2 process alarm relays configurable as Failsafe?
Q: For the STA 4-Wire SIL 2 and SIL 3 Compliant Programmable Current/Voltage and RTD/Thermocouple Safety Trip Alarms, can the process alarm relays be configured as Failsafe?  Can the process relay output of the SPA2-TRPRG be configured Failsafe?
Published: September 14, 2017

EHELP: 535 Power up Using Remote Setpoint

EHELP: 535 Power up Using Remote Setpoint
Q. When the 535 1/4 DIN Single Loop PID Process Controller loses power with remote setpoint on, it comes back up in local setpoint mode. Is there a way to have the 535 always come back up in remote setpoint mode when power is restored?
Published: September 13, 2017

EHELP: Is It Possible to Configure the SIY for 0-1mA Input?

EHELP: Is It Possible to Configure the SIY for 0-1mA Input?

Q. Currently I have an application where I need to configure my SIY input to 0-1mA. Is that possible?

Published: August 30, 2017